WASTE WATER TREATMENT PLANT
Project type: Infrastructure / Waste water management / Civil Engineering
Project description:
Capacity: 4 320 m³/24 hours.
Built-up area – 8 000 m²
For equivalent population: І stage – 10 00 inhabitants;
Secondary Settlers:
- dimensions – 35.00 m / 4.75 m;
- height – 5.00 m;
Pumping station with air blowers
- total air blowers capacity – 1200 m³/hour;
- sewer Main – D 500 mm.,
Duration of construction: 12 months.
Location: Zlatograd, Bulgaria