WASTE WATER TREATMENT PLANT

Project type: Infrastructure / Waste water management / Civil Engineering

Project description:

Capacity: 4 320 m³/24 hours.

Built-up area – 8 000 m²

For equivalent population: І stage – 10 00 inhabitants;

Secondary Settlers:

  • dimensions – 35.00 m / 4.75 m;
  • height – 5.00 m;

Pumping station with air blowers

  • total air blowers capacity – 1200 m³/hour;
  • sewer Main – D 500 mm.,

Duration of construction: 12 months.

Location: Zlatograd, Bulgaria