WASTE WATER TREATMENT PLANT
Project type: Infrastructure / Waste water management / Civil Engineering
Project description:
Capacity: 4 320 m³/24 hours.
Built-up area – 8 000 m²
Population of the settlement: І stage – 10 000 inhabitants;
Secondary Settlers:
- dimmensions – 35.00 m / 4.75 00 m;
- height – 5.00 m;
Pumping station with air blowers:
- total air blowers capacity - 1200 m³/hour;
- sewer – D 800 mm.,
Duration of construction: 12 months.
Location: Madan, Bulgaria
Status: Completed
Construction period: ???
Details: Upon request