WASTE WATER TREATMENT PLANT

Project type: Infrastructure / Waste water management / Civil Engineering

Project description:

Capacity: 4 320 m³/24 hours.

Built-up area – 8 000 m²

Population of the settlement: І stage – 10 000 inhabitants;

Secondary Settlers:

  • dimmensions – 35.00 m / 4.75 00 m;
  • height – 5.00 m;

Pumping station with air blowers:

  • total air blowers capacity - 1200 m³/hour;
  • sewer – D 800 mm.,

Duration of construction: 12 months.

Location: Madan, Bulgaria

Status: Completed

Construction period: ???

Details: Upon request