WASTE WATER TREATMENT PLANT

Project type: Infrastructure / Waste water management / Civil Engineering

Project description:

Capacity: 4 200 m³/24 hours.

Built-up area – 9 300 m²

For equivalent population:

  • І stage – 14 500 inhabitants;
  • ІІ stage – 65 000 inhabitants.

Secondary Radial Settlers:

  • Diameter – 20.00 m;
  • Height – 4.50 m;

Pumping station with air blowers

Total capacity of the pumps - 50 l/sec;

Location: Tsarevo, Bulgaria

Status: Completed

2024 © HGROUP. All rights reserved *